Otros recursos de Ho,Johnny C.
| Resultados 1 - 8 de 8 de Ho,Johnny C.. (8 segundos) |
Documentos:

1. (100%)
Flowshop sequencing with mean flowtime objective
- Ho, Johnny C.
- 27-may-2009

2. (75%)
Minimizing flowtime subject to optimal makespan on two identical parallel machines
- Gupta,Jatinder N. D.; Ho,Johnny C.
We consider the problem of scheduling jobs on two parallel identical machines where an optimal sched ...
(text/html) - 23-may-2005

3. (75%)
Minimizing the number of tardy jobs for m parallel machines
- Ho, Johnny C.; Chang, Yih-Long
- 27-may-2009

4. (75%)
A new heuristic for the n-job, M-machine flow-shop problem
- Ho, Johnny C.; Chang, Yih-Long
- 27-may-2009

5. (75%)
Scheduling with two job classes and setup times to minimize the number of tardy jobs
- Gupta, Jatinder N. D.; Ho, Johnny C.
- 27-may-2009

6. (63%)
Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs
- Ruiz-Torres, Alex J.; Lopez, Francisco J.; Ho, Johnny C.
- 27-may-2009

7. (63%)
Generating Pareto schedules with outsource and internal parallel resources
- Ruiz-Torres, Alex J.; Ho, Johnny C.; Lopez, Francisco J.
- 27-may-2009

8. (50%)
Large-scale, heterogeneous integration of nanowire arrays for image sensor circuitry
- Fan, Zhiyong; Ho, Johnny C.; Jacobson, Zachery A.; Razavi, Haleh; Javey, Ali
We report large-scale integration of nanowires for heterogeneous, multifunctional circuitry that uti ...
- 13-feb-2009
|
|
|