Publicidad

Publicidad

becas.universia.netBiblioteca.Net

Buscar recursos:

Buscador Google

rss_1.0 Otros recursos de Ho,Johnny C.

Resultados 1 - 8 de 8 de Ho,Johnny C.. (8 segundos)

Documentos:
1. (100%) Flowshop sequencing with mean flowtime objective - Ho, Johnny C.
- 27-may-2009

2. (75%) Minimizing flowtime subject to optimal makespan on two identical parallel machines - Gupta,Jatinder N. D.; Ho,Johnny C.
We consider the problem of scheduling jobs on two parallel identical machines where an optimal sched ...
(text/html) - 23-may-2005

3. (75%) Minimizing the number of tardy jobs for m parallel machines - Ho, Johnny C.; Chang, Yih-Long
- 27-may-2009

4. (75%) A new heuristic for the n-job, M-machine flow-shop problem - Ho, Johnny C.; Chang, Yih-Long
- 27-may-2009

5. (75%) Scheduling with two job classes and setup times to minimize the number of tardy jobs - Gupta, Jatinder N. D.; Ho, Johnny C.
- 27-may-2009

6. (63%) Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs - Ruiz-Torres, Alex J.; Lopez, Francisco J.; Ho, Johnny C.
- 27-may-2009

7. (63%) Generating Pareto schedules with outsource and internal parallel resources - Ruiz-Torres, Alex J.; Ho, Johnny C.; Lopez, Francisco J.
- 27-may-2009

8. (50%) Large-scale, heterogeneous integration of nanowire arrays for image sensor circuitry - Fan, Zhiyong; Ho, Johnny C.; Jacobson, Zachery A.; Razavi, Haleh; Javey, Ali
We report large-scale integration of nanowires for heterogeneous, multifunctional circuitry that uti ...
- 13-feb-2009